15T/H quicklime grinding project in Jiangxi province
- MATERIAL : Quicklime and limestone
- FEEDING SIZE : 0-10mm
- OUTPUT SIZE : 200 mesh
- CAPACITY (MM) : 15T/H
- CONFIGURATION: MTW178G Series Heavy Trapezoid Mill
- Grinding Process:
-
1.After calcined, the quicklime is fed into the buffer bin by forklift.
2.Then, quicklime is evenly and quantitatively continuously sent to the main grinding room by the belt feeder for grinding.
3.Under the action of the analyzer, the materials that do not meet the fineness requirements are sent back to the grinding chamber for re-grinding. The qualified materials are separated into the cyclone collector through the airflow, and then discharged through the discharge device. That is the finished product. - CUSTOMER FEEDBACK
- The customer is a very cautious company. After many investigations and comparisons, the MTW Series Heavy Trapezoid Mill of Liming Heavy Industry was finally choice. The reason for the selection is not only the excellent technology, stable performance and environmental protection, but also the innovation and improvement of the mill. This makes the operation of the whole project up to the production standard and also brings good economic benefits to customer.