kefidsh@kefidgroup.com

Home > Case

Power plant limestone desulfurization circulating fluidized bed project in shanxi,China

Material : Limestone

Feeding sizes :  ---

Output size :Inside the furnace: 0.1-1.5mm, D50=0.45mm;After the furnace: ≤0.063mm, 250 mesh D90

Capacity : ≥200T/H

Equipment :4 MTW215 European Grinding Mill



Chat online Leave a Message
Crushing Process:
The project will construct two 660,000 kilowatt supercritical circulating fluidized bed units and simultaneously construct desulfurization and denitrification devices. After the project is completed, it will be the world's first coal gangue power generation project using a 660MW-class supercritical circulating fluidized bed boiler. The annual heat supply is expected to reach 10 million GJ, and the annual consumption of low-calorific value coal in the mining area will reach 5.1 million tons.



Necessary Equipment
Related Case
ONLINE MESSAGE

Full Name *

Country *

E-mail address *

Cellphone Number *

Select product/Service *

Raw material *

Capacity *

Company Name

Equipment Budget(USD)

Message *