Power plant limestone desulfurization circulating fluidized bed project in shanxi,China
Material : Limestone
Feeding sizes : ---
Output size :Inside the furnace: 0.1-1.5mm, D50=0.45mm;After the furnace: ≤0.063mm, 250 mesh D90
Capacity : ≥200T/H
Equipment :4 MTW215 European Grinding Mill
- Crushing Process:
- The project will construct two 660,000 kilowatt supercritical circulating fluidized bed units and simultaneously construct desulfurization and denitrification devices. After the project is completed, it will be the world's first coal gangue power generation project using a 660MW-class supercritical circulating fluidized bed boiler. The annual heat supply is expected to reach 10 million GJ, and the annual consumption of low-calorific value coal in the mining area will reach 5.1 million tons.