Kefid 120tph Tungsten ore crushing production line in Vietnam
- Process Description:
- The discharging size is 0-30mm, the crushed lump ore should enter the X-ray dressing machinery, and then into the ore grinding and dressing production line.
It was put into operation in August 2018. At present, the equipment works in three shifts well.
- Necessary Equipment
- Related Case